Welcome to the land world

Farm lot / Fishpond 5.9 hectare at Nasugbu for sale

228,800 USD
Pantalan, Nasugbu
16 view
Land ID: 77582 Update time: 2020-12-26 19:34:56
Trading years: permanent Size: 57187sqm
Transaction type: for sell

Words from Seller

Farm lot / Fishpond 5.9 hectare at Nasugbu, Batangas for sale (Price:11M NET)

Included in the sale are the ff:

1) Two pcs newly built bahay kubo size: (8ft X 18ft)

2) Kubo or Bodega (storage room)

3) Takeuchi PC-016 Mini Backhoe with breaker line and 4pcs digging buckets

4) Kubota tractor 22HP with loader/implements(rotavator) and trailer

5) Pasipa 8inches stainless steel pipe with 16HP Yamada Engine.

6) 5KVA & 3KVA Gensets.

7) 4inch and 2inch portable water pump with engine.

8) 18Ft Fiver Glass Boat with portable engine assy

9) 6pcs 50watt Solar Panel Street lights. 1pc 300watt Solar panel assy, 1pc 100watt solar Panel assy (fitted sa bahay kubo).

10) 1pcs big Goat  house.

11) Planted 75 pcs coconut tree, 10pcs assorted bamboo, Dragon fruit, and various fruit bearing tree, Nipa tree grown in the area is almost half hectare

查看全部

Land Parameter

Slop:2°-6°
Altitude:
Direction:All
Landform: unknown
Land shape:
Mechanized operation: can't support
Land flatness:
Drainage: no floods
Irrigation:no irrigation
Topsoil texture:
Fertility: medium
Thickness of effective soil:
Salinization: no
Pollution:no
Acidity or alkalinity:
Organic matter:
Depth from barrier:
Vegetation coverage:
Depth to groundwater:
Climate type:Tropical Rainforest Climate
Sunshine duration h/Yr:
Sunshine:
Annual average temperature:
Frost-free period/Days:
Precipitation:
Humidity:

Transportation & Other Facilities

Road conditions:
Airport: >60mins
Highway:30-60mins
Railway: 30-60mins
Port:>60mins
High-speed railway: <30mins
Provincial/Interstate highway:<30mins
National highway: <30mins
County road:<30mins
Township road: <30mins
Village road/Self-built road:<30mins
Buses: no
Electricity:yes
Water supply: no
Irrigation:
Heat supply: no
Energy:
Communications: connected
TV system:disconnected
Internet system: disconnected
Sewage:
Greening:
Parking:no
Education: no
Medical treatment:no
Sanitation: no
Entertainment:no
Food: basically complete
others:
Surrounding water system: no
Surrounding mountains:no
Attractions within 5 km: no
Nearby industrial clusters:
Comfort index:
Noise index:
API:
WQI:
Get More Land Info

Get More Land Info

Select country
no data
Select a country
no data
refresh
Get More Land Info

Get More Land Info

Select country
no data
Select a country
no data
refresh