Airport:>60mins
Highway:
>60mins
Railway:>60mins
Port:
>60mins
High-speed railway:30-60mins
Provincial/Interstate highway:
30-60mins
National highway:30-60mins
County road:
<30mins
Township road:30-60mins
Village road/Self-built road:
<30mins
Electricity:no
Water supply:
no
Irrigation:manual
Heat supply:
no
Energy:natural gas pipeline
Communications:
TV system:disconnected
Internet system:
disconnected
Sewage:septic tank
Greening:
Parking:to be improved
Education:
to be improved
Medical treatment:no
Sanitation:
basically complete
Entertainment:to be improved
Food:
to be improved
Attractions within 5 km:no
Area of tenure(ac,sqm,ha):
Exclusive use area(ac,sqm,ha):
Apportioned area(ac,sqm,ha):
Building type:
Building area(ac,sqm,ha):
Building density:≤25%
Plot ratio:
≤3.0
Green area ratio:≥20%
Limited height:
60m-90m
Nearby industrial clusters:aquaculture
Comfort index:
±1
Noise index:20db-40db
API:
201-300(unhealthy)
WQI:Class III(potable water&second level protection area)