1, adequate water source, 2-3 meters wide ditches, water source of water wells; 2, convenient transportation,, 5 meters wide cement road access, a distance from the village, convenient management; 3, cement road direct access, convenient mechanized operation; 4, fertile black soil, good soil, can be grown, can be farmed; 5/ can be cooperated perimeter plots.
查看全部