The Rental covers an area of 50848 acres of land, diverted 25 or 38 years, is unutilized, outside the ecological red line, suitable for photovoltaic power projects, there are 110v of 2 substations within 15 km, each of which consumes 100 megawatts of electricity each, the transfer price is proposed.
查看全部